Coinfast has designed and built mining farms across multiple countries, drawing on 10+ years of operational experience to deliver facilities that perform from day one.
From site selection and power infrastructure negotiation to cooling systems, ASIC rack layout, security, and network design — Coinfast provides end-to-end project management for greenfield and brownfield mining farm development.
Project Scope
- Site Selection: Power availability, grid stability, regulatory environment, climate, and logistics assessment.
- Power Infrastructure: Grid connection, transformer procurement, backup power systems, natural gas generation integration.
- Facility Design: ASIC rack layout, cooling system design (air or immersion), fire suppression, structural engineering.
- Network & Security: Mining pool connectivity, facility monitoring systems, 24/7 security design.
- Project Management: Full construction supervision, commissioning, and handover.