Everything you need to know before hosting with Coinfast.
Coinfast provides comprehensive services including ASIC miner sales, transportation and customs clearance, hosting facilities, mining farm construction, AI data center colocation, natural gas mining, and professional consulting.
Our facilities are strategically located in Dubai (UAE), Russia (Komi), Xinjiang (China — Hami, Kuitun, Hetian), Paraguay, and the United States.
There is no setup fee for deployments of 350 or more miners. For smaller quantities (below 350 miners), a one-time fee of $50 per miner applies.
We support air-cooled ASICs for Bitcoin, ETHW/ETC, LTC/DOGE, KAS, and other major algorithms — including models from Bitmain, MicroBT (Whatsminer), and Canaan (Avalon).
All facilities are equipped with 24/7 security and experienced operations teams to ensure smooth and safe equipment operation at all times.
We guarantee 99% monthly uptime across all facilities, backed by 24/7 on-site technicians and proactive monitoring.
All mined cryptocurrency is transferred directly to the client's pool account. Clients retain full control of their assets and transactions.
We encourage advance-arranged visits to our offices or hosting facilities. Unfortunately, unannounced visits cannot be accommodated. Please contact us to schedule.
We are committed to sustainability. Multiple Coinfast facilities utilise 100% renewable or low-carbon power sources including natural gas and hydroelectric power.
Performance monitoring is available through your mining pool account. We also issue detailed daily reports twice per day.
We first diagnose on-site. If repair is required, the unit is dispatched to the repair centre. Clients are notified and provided with a detailed monthly repair log.
The minimum hosting quantity is 350 miners. Maximum capacity depends on available space at the selected facility.
All Coinfast facilities support 240V by default. Miners must have a power draw of 2.8KW or more and valid legal import documentation.
The minimum contract term is one year. Renewal and other conditions are clearly set out in the formal hosting contract.
Depending on installation complexity, miners typically go live within 1–3 hours of arriving at the facility.
Clients are billed only for actual electricity consumed plus a 2% loss allowance, plus any necessary repair or replacement costs. Full billing transparency is provided.
Subject to available space at the facility, equipment setups can be expanded or upgraded. Contact your account manager to discuss options.
Contract termination procedures are detailed in your hosting contract, which sets out all required steps and conditions.
Still have questions?
Our Dubai team responds within one business day. Reach us by WhatsApp, Telegram, or email.